BROCHURE:
In 2002, Emerson Network Power's Liebert XD family was the industry's first row-based cooling system. Now, we have taken more than 40 years of engineering experience and the most advanced technologies to design the Liebert CRV row-based precision cooling system. Learn the flexibility, TCO and availability benefits of their latest cooling solution.
WHITE PAPER:
With technology infiltrating every aspect of healthcare, traditional approaches to power protection no longer suffice. This paper introduces a new hospital power protection model that leverages technologies and best practices forged in the data center.
WHITE PAPER:
Technology systems such as electronic medical records and digital imaging are revolutionizing healthcare. The continuous operation of these systems has become increasingly critical. Emerson Network Power has developed three centralized UPS configurations specifically for healthcare settings.
EGUIDE:
In this e-guide: Simplifying the deployment and management of datacentre hardware systems is one of the main draws of converged and hyper-converged infrastructure setups for enterprises.
RESOURCE:
Access this resource to learn about the three ways flash provides value and a strong ROI. Read on to find out why additional virtualization features prove that flash is a smart investment.
EZINE:
Consumerisation of IT in the ASEAN regionMobile devices are being used by staff in their work environment. So much so that businesses can no longer ignore it.
EGUIDE:
An aging data center may no longer be able to meet the power, cooling, and structural demands of advancing technologies. This exclusive e-guide details five data center upgrade strategies to modernize your facility and Robert McFarlane, with over 35 years experience in data center design, power, and cooling, offers data center design advice.
EGUIDE:
From power distribution outlets to available network connectivity, server deployment can be a difficult process. Explore ten considerations that should be factored into every rack-and-stack server deployment checklist.
EZINE:
In this week's Computer Weekly, Dell's proposed $67bn acquisition of EMC would be the biggest in the history of IT – we assess the implications. £175bn of IT outsourcing contracts come up for renewal in the next three years- what are your options? And we hear from IT leaders about security and the internet of things. Read the issue now.